Assembling the 1kW solar array on Uni-Rac top of pole mount. We had to drill extra holes in the SolarWorld modules, but all together the assembly went really well.
Viewed: 636 times.
|
[1024x768] [2272x1704]
Randy with Community Electric in Lanesboro, MN trenches for the solar.
Viewed: 620 times.
|
|
|
|
|
[1024x768] [2272x1704]
Proudly using components made by our friends at Outback, Bergey, Midnite Solar, and Magnum.
Viewed: 618 times.
|
[1024x768] [2272x1704]
Solar array bolted together. Assembly took about 2 hours with three people.
Viewed: 589 times.
|
|
|
[768x1024] [1704x2272]
The tower was first raised without the Bergey XL.1 on top. Raising the tower was tricky because most of the guy wires were replaced and the site was not level.
Viewed: 615 times.
|
|
|
[1024x768] [2272x1704]
More tower raising. It's always scary seeing the weird shape the tower takes on.
Viewed: 606 times.
|
|
|
[1024x768] [2272x1704]
James Jarvis, Joe Deeden, and Clare jarvis start assembly of the Bergey XL.1.
Viewed: 620 times.
|
|
|
|
|
|
|
|
[768x1024] [1704x2272]
Jim risks his head to put the blades on. Why does Bergey specify that it has to be installed this way?
Viewed: 621 times.
|
|
|
|
|
|
|
[768x1024] [1704x2272]
James stood at the end of the tower and directed the show. Radios were used to communicate the tractor lifting the tower and directions were shouted to the two side guy points to keep constant slack / tension in the cables.
Viewed: 630 times.
|
|
|
[1024x768] [2272x1704]
The base plate decided it was going to be at an angle. It remains that way.
Viewed: 586 times.
|
|
|
|
|
|
|
[768x1024] [1704x2272]
Junction box for power and wind sensor cables. Flexible conduit goes about 5 feet up the tower.
Viewed: 611 times.
|
|
|
|
|
[1024x768] [2272x1704]
The Magnum inverter and Midnite e-panel are pumping out 120 volts!
Viewed: 614 times.
|